{"id":5312,"date":"2006-12-26T19:59:26","date_gmt":"2006-12-26T19:59:26","guid":{"rendered":"https:\/\/ajetebeqiraj.org\/2006\/12\/26\/perspektive-e-re-per-hidrocentralin-e-decanit\/"},"modified":"2023-03-11T23:34:14","modified_gmt":"2023-03-11T23:34:14","slug":"perspektive-e-re-per-hidrocentralin-e-decanit","status":"publish","type":"post","link":"http:\/\/ajetebeqiraj.org\/en\/perspektive-e-re-per-hidrocentralin-e-decanit\/","title":{"rendered":"Perspektive e re per hidrocentralin e De\u00e7anit"},"content":{"rendered":"<p><strong>26 dhjetor 2006, Doj\u00e7e Vele.<\/strong> Procesi I privatizimit n\u00eb Kosov\u00eb po vazhdon me vale te reja.Ndersa, nj\u00eb nd\u00ebr projektet me investime kapitale n\u00eb kuad\u00ebr t\u00eb k\u00ebtij procesi I cili nj\u00ebherit zbut edhe problemin e furnizimit me energji elektrike, \u00ebsht\u00eb privatizimi I ish-hidrocentralit Kozhnjer, n\u00eb Decan, me emer te ri dhe perspektive te re. <!--more--><\/p>\n<p>Rruga dhjet\u00ebkilomet\u00ebrshe p\u00ebrgjat\u00eb Gryk\u00ebs s\u00eb Decanit, mbi t\u00eb cil\u00ebn ngriten bjeshk\u00ebt e mbuluara me bor\u00eb, na con tek hidrocentrali Lumbardh. Drunjt\u00eb shtatlart\u00eb perqafojn\u00eb qiellin e hirt\u00eb, I cili s\u2019pushon t\u00eb reshurat, sikur ta dinte se nj\u00eb mot I till\u00eb I duhej mbar\u00ebvajtjes s\u00eb hidrocentralit t\u00eb ngrehur n\u00eb gji t\u00eb k\u00ebsaj gryke magjeps\u00ebse.<\/p>\n<p>Objekti I nd\u00ebrmarrjes publike Kozhnjeri, I cili u inaugurua n\u00eb vitin 1957 dhe vazhdoi pun\u00ebn n\u00ebn mbik\u00ebqyrjen e pik\u00ebs s\u00eb shp\u00ebrndarjes, n\u00eb Pej\u00eb, deri n\u00eb vitin 1999, gjat\u00eb luftes dhe pas saj, u demolua pothuaj n\u00eb t\u00ebr\u00ebsi. Por, me iniciativen e afaristit shqiptaro amerikan, Florin Krasniqit, u renovua dhe q\u00eb nga 12 tetori I viti 2005, rifilloi pun\u00ebn me emrin \u201cHidrocentrali Lumbardh\u201d.<\/p>\n<p>Florin Krasniqi, pronar I hidrocentralit thote se:\u201cSituata energjetike n\u00eb Kosov\u00eb \u00ebsht\u00eb mjeruese\u2026Por, \u00ebsht\u00eb tmerr\u00ebsisht mjeruese n\u00ebqoft\u00ebse ne nuk b\u00ebjm\u00eb kurrgja p\u00ebr situat\u00ebn. N\u00ebqoft\u00ebse vet\u00ebm folim, vet\u00ebm ankohemi, vet\u00ebm kritikojm\u00eb. Un\u00eb e kam nd\u00ebrtu nje hidrocentral relativisht t\u00eb vog\u00ebl. Por, p\u00ebrdit\u00eb ndjehem fajtor q\u00eb nuk mund t\u00eb b\u00ebj m\u00eb shum\u00eb p\u00ebr energjetik\u00ebn e Kosov\u00ebs!\u201d <strong><em>\u00a0\u00a0<\/em><\/strong><\/p>\n<p>Hidrocentrali i dikurshem eshte ringritur ne forme te re dhe me emer te ri<\/p>\n<p>Objekti i hidrocentralit\u00a0 l\u00ebn\u00eb shkret q\u00eb nga viti \u201899, tashm\u00eb \u00ebsht\u00eb rikthyer n\u00eb jet\u00eb.\u00a0 Aty fitohet buka p\u00ebr 23 familje; aty buron drita p\u00ebr 6000 t\u00eb tjera. Sepse, me nj\u00eb investim prej 8 milione eurosh, fuqia e lumit Lumbardh, e cila dikur p\u00ebrdorej p\u00ebr sharra e mullinj, \u00ebsht\u00eb shnd\u00ebrruar n\u00eb nj\u00eb burim t\u00eb ri drite.<strong>\u00a0<\/strong>Zhurma e fuqishme e gjenerator\u00ebve d\u00ebgjohet q\u00eb nga jasht\u00eb; fuqia e drit\u00ebs q\u00eb prodhohet br\u00ebnda!<\/p>\n<p>Xhevdet Krasniqi drejtor ekzekutiv I hidrocentralit Lumbardh, n\u00eb Decan, flet p\u00ebr v\u00ebshtir\u00ebsit\u00eb e fillimit: \u201cN\u00eb Kosov\u00eb ka pas trubullira dhe nuk ka pas garanc\u00eb p\u00ebr investime. Por, ne t\u00eb gjith\u00eb e kemi marr\u00eb n\u00eb at\u00eb m\u00ebnyr\u00eb q\u00eb n\u00eb Kosov\u00eb s\u2019kemi c\u2019humbim. Kosova \u00ebsht\u00eb jona dhe investimi ka me mbet n\u00eb Kosov\u00eb.\u201d<\/p>\n<p>Inxhinjeri Krasniqi:\\&#8221;Vetem me energjine e Lumbardhit mund te furnizojme Decanin me rrethine\\&#8221;<\/p>\n<p>Drejtori teknik, Agim Krasniqi, I cili deri m\u00eb tani ka jetuar n\u00eb Shqip\u00ebri dhe ka nj\u00eb p\u00ebrvoj\u00eb t\u00eb gjat\u00eb n\u00eb k\u00ebt\u00eb fush\u00eb, jep nj\u00eb vler\u00ebsim p\u00ebr hidrocentralin Lumbardh:\u201c\u00cbsht\u00eb hidrocentral bashk\u00ebkohor, komplet digjital.I gjith\u00eb sistemi I informacionit, I matjeve, I mbrojtjeve, l\u00ebshimet, ndalimet, mund t\u00eb komandohen nga nj\u00eb kompjuter, q\u00eb \u00ebsht\u00eb dhoma e monitorimit\u201d-thote Krasniqi, i cili flet edhe per\u00a0 kapacitetin prodhues : \u201cVar\u00ebsisht nga prurjet e ujit, prodhojm\u00eb 8.3 mhw. Si fuqi e instaluar e hidrocentralit, mund t\u00eb mahet Decani me rrethin\u00eb. Me nj\u00eb fjal\u00eb, futet n\u00eb rangun e hidrocentraleve me fu\u00ebi t\u00eb madhe, I cili br\u00ebnda nj\u00eb viti mund t\u00eb prodhoj\u00eb 30 milion kl\u00eb ore!\u201d<\/p>\n<p>Se Florin Krasniqi \u00ebsht\u00eb n\u00eb k\u00ebrkim t\u00eb projekteve t\u00eb reja dhe t\u00eb bashk\u00ebpunimit korrekt, d\u00ebshmon drejtori teknik Agim Krasniqi, I cili sjell nj\u00eb njoftim p\u00ebr projektin e hidrocentralin, Lumbardhi 2, projekti p\u00ebr t\u00eb cilin \u00ebsht\u00eb n\u00eb punim e sip\u00ebr.\u00a0\u00a0\u00a0\u00a0\u00a0 \u201cHirocentrali tjet\u00ebr do b\u00ebhet rreth 22 m\u00eb\/h, prodhimin vjetor mund ta ket\u00eb rreth 100 milion k\u00eb\/h ne vit. Nd\u00ebrsa, shuma e investimeve kap rreth 33 milion euro.\u201d.<\/p>\n<p>Afaristi shqiptaro-amerikan Florin Krasniqi hulumton per mundesi te reja investimi ne Kosove<\/p>\n<p>Afaristi shqiptar Florin Krasniqi, me prejardhje nga Rajoni I Pej\u00ebs, I cili tash e 20 vjet jeton dhe punon <strong>\u00a0<\/strong>n\u00eb Nju Jork t\u00eb SHBA-s\u00eb, ka nj\u00eb \u00ebnd\u00ebrr t\u00eb vetme: q\u00eb cdo m\u00ebngjes, mij\u00ebra pun\u00ebtor\u00eb t\u2019I ngjiten Gryk\u00ebs s\u00eb Decanit. Q\u00eb mij\u00ebra t\u00eb tjer\u00eb t\u00eb pushtojn\u00eb fabrikat e Kosov\u00ebs. Por, sipas tij, pamundesia e sigurimit t\u00eb ekzistenc\u00ebs n\u00eb Kosov\u00eb nuk \u00ebsht\u00eb arsyeja e vetme q\u00eb shqiptareve ua imponon marrjen e bot\u00ebs n\u00eb sy. Se ka arsye\u00a0 tjera q\u00eb I t\u00ebrheqin prapa: \u201cGjenetikisht dhe histroikisht, nuk jemi t\u00eb m\u00ebsuar t\u00eb punojm\u00eb n\u00eb ekipe, t\u00eb bashk\u00ebpunojm\u00eb. Ekonomia pa partneritet s\\&#8217;mund t\u00eb ec perpara\u201d.<\/p>\n<p>P\u00ebrkunder bindjes se Kosova edhe m\u00eb tej \u00ebsht\u00eb nj\u00eb zon\u00eb e kuqe p\u00ebr investime, Florin Krasniqi nuk iu frigohet investimeve kapitale. Sepse, sipas tij:\u00a0\u201cJetojm\u00eb n\u00eb Evrop\u00eb. I kemi t\u00eb gjitha melmesat p\u00ebr me I realizu nj\u00eb shtet ku njer\u00ebzit mund t\u00eb jetojn\u00eb t\u00eb lir\u00eb, t\u00eb pasur t\u00eb sigurt. Pse mos ta b\u00ebjm\u00eb? Mendoj se kur njer\u00ebzit\u00a0 besojn\u00eb n\u00eb Zot, n\u00eb veten n\u00eb nj\u00ebri-tjetrin, suksesi \u00ebsht\u00eb aty!\u201d<\/p>","protected":false},"excerpt":{"rendered":"<p>26 dhjetor 2006, Doj\u00e7e Vele. Procesi I privatizimit n\u00eb Kosov\u00eb po vazhdon me vale te reja.Ndersa, nj\u00eb nd\u00ebr projektet me investime kapitale n\u00eb kuad\u00ebr t\u00eb k\u00ebtij procesi I cili nj\u00ebherit zbut edhe problemin e furnizimit me energji elektrike, \u00ebsht\u00eb privatizimi I ish-hidrocentralit Kozhnjer, n\u00eb Decan, me emer te ri dhe perspektive te re.<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"default","ast-site-content-layout":"","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"jetpack_post_was_ever_published":false,"slim_seo":{"title":"Perspektive e re per hidrocentralin e De\u00e7anit - Ajet\u00ebBeqiraj.org","description":"26 dhjetor 2006, Doj\u00e7e Vele. Procesi I privatizimit n\u00eb Kosov\u00eb po vazhdon me vale te reja.Ndersa, nj\u00eb nd\u00ebr projektet me investime kapitale n\u00eb kuad\u00ebr t\u00eb k\u00ebtij pro"},"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[3],"tags":[274,748,746,747],"class_list":["post-5312","post","type-post","status-publish","format-standard","hentry","category-te-ndryshme","tag-decan","tag-florim-krasniqi","tag-hidrocentrali-lumbardhi","tag-kozhnjer"],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"http:\/\/ajetebeqiraj.org\/en\/wp-json\/wp\/v2\/posts\/5312","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/ajetebeqiraj.org\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/ajetebeqiraj.org\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/ajetebeqiraj.org\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/ajetebeqiraj.org\/en\/wp-json\/wp\/v2\/comments?post=5312"}],"version-history":[{"count":0,"href":"http:\/\/ajetebeqiraj.org\/en\/wp-json\/wp\/v2\/posts\/5312\/revisions"}],"wp:attachment":[{"href":"http:\/\/ajetebeqiraj.org\/en\/wp-json\/wp\/v2\/media?parent=5312"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/ajetebeqiraj.org\/en\/wp-json\/wp\/v2\/categories?post=5312"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/ajetebeqiraj.org\/en\/wp-json\/wp\/v2\/tags?post=5312"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}